PQFA Instructions Manual
Asea Brown Boveri Jumet S.A.
55
9
9
.
.
3
3
.
.
3
3
.
.
2
2
.
.
M
M
e
e
a
a
s
s
u
u
r
r
e
e
m
m
e
e
n
n
t
t
o
o
f
f
C
C
T
T
i
i
n
n
p
p
h
h
a
a
s
s
e
e
L
L
2
2
a
a
n
n
d
d
L
L
3
3
The same operations as those described in the previous paragraph must be
repeated with the phase L2 (Figure 9.5) and phase L3 (Figure 9.6).
For a balanced load (which is usually the case in most of the three phase
systems), the phase shift should be approximately the same for all the three
phases.
L1
L2
L3
Load side
Supply side
K
L
k
l
K
L
k
l
K
L
k
l
PQF
X5.2
X5.3
X5.4
X5.5
X5.6
X5.1
L1
L2
L3
Positive direction
Ch1
Ch2
Figure 9.5. Connection of the scopemeter for checking CT in phase L2.
L1
L2
L3
Load side
Supply side
K
L
k
l
K
L
k
l
K
L
k
l
PQF
X5.2
X5.3
X5.4
X5.5
X5.6
X5.1
L1
L2
L3
Positive direction
Ch1
Ch2
Figure 9.6. Connection of the scopemeter for checking CT in phase L3.
Summary of Contents for PQFA
Page 1: ...Instructions Manual PQFA Power Quality Filter ABB Jumet ...
Page 19: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 19 Master cubicle view Zoom on next page ...
Page 20: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 20 ...
Page 21: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 21 Control rack details ...
Page 22: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 22 Master cubicle door view ...
Page 24: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 24 ...
Page 25: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 25 Slave cubicle door view ...
Page 28: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 28 ...