9.3.
Step 3
Step 3:
Current transformer check
Improper CT connection is the most frequent cause of problems during
commissioning.
The following procedure will allow you to check the CT connection.
Warning: The secondary circuit of a loaded CT must never be opened
otherwise extremely high voltages may appear which can
lead to physical danger or destruction of the CT itself.
9.3.1. PQF connection diagram
Figure 9.1. shows the normal connection of the PQF. It must be noted that:
? ?
L1, L2 and L3 rotation must be clockwise,
? ?
The CTs must be on the supply (line) side of the PQF,
? ?
One secondary terminal of the CT must be earthed.
L1
L2
L3
Load side
Supply side
K
L
k
l
K
L
k
l
K
L
k
l
PQF
X5.2
X5.3
X5.4
X5.5
X5.6
X5.1
L1
L2
L3
Figure 9.1. PQF connection
Summary of Contents for PQFA
Page 1: ...Instructions Manual PQFA Power Quality Filter ABB Jumet ...
Page 19: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 19 Master cubicle view Zoom on next page ...
Page 20: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 20 ...
Page 21: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 21 Control rack details ...
Page 22: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 22 Master cubicle door view ...
Page 24: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 24 ...
Page 25: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 25 Slave cubicle door view ...
Page 28: ...PQFA Instructions Manual Asea Brown Boveri Jumet S A 28 ...