Note
Action
xx2000002692
Tip
Make a mark on the electrode holder to
remember the intersection between the
electrode holder and the arm.
Loosen the screws and nuts (pos. 1)
holding the electrode holder (pos. 2) in
place.
11
Gently pull out the electrode holder (pos.
2) together with the water hoses (pos. 3).
Protect the hose ends so no contamin-
ants enter.
12
xx2200000287
Inspect the new arm for defects. Make
sure all contact surfaces are clean.
13
Continues on next page
Product manual - GWT C9
105
3HAA010198-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8 Replacement of the welding gun arm
Continued
Summary of Contents for GWT C9
Page 1: ...ROBOTICS Product manual GWT C9 ...
Page 62: ...This page is intentionally left blank ...
Page 124: ...This page is intentionally left blank ...
Page 126: ......
Page 127: ......