![ABB GWT C9 Product Manual Download Page 42](http://html.mh-extra.com/html/abb/gwt-c9/gwt-c9_product-manual_3045545042.webp)
2.5.3 Water cooling system
Requirements
The input and output water circuits should be equipped with manual valves. To
avoid water leaks, it is recommended to install a bleeder system in order to release
the pressure in the cooling circuit before maintenance operation.
Value
Parameter
10 bar
Maximal pressure
30°C
Maximal temperature at inlet
10°C
Minimal temperature at inlet
5 l/min
Minimal water flow through transformer
2.5 l/min
Minimal water flow through each arm
0.2 mm
Minimal filtration
i
i
Cooling water must be free of contaminants. The flow passages in the welding gun can become
blocked by contaminants causing restricted water flow and overheating. Use only neutral water
without chlorides, sulfates etc.
WARNING
To ensure the lifetime of diodes in the transformer, the transformer must be
cooled in the correct way by water flow.
Welding without water supply, or with predefined values lower than minimal water
flow, is strictly forbidden.
42
Product manual - GWT C9
3HAA010198-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
2 Product description
2.5.3 Water cooling system
Summary of Contents for GWT C9
Page 1: ...ROBOTICS Product manual GWT C9 ...
Page 62: ...This page is intentionally left blank ...
Page 124: ...This page is intentionally left blank ...
Page 126: ......
Page 127: ......