![ABB DPA 250 S4 Operating Manual Download Page 27](http://html.mh-extra.com/html/abb/dpa-250-s4/dpa-250-s4_operating-manual_5448027.webp)
27
—
4 Operating modes
In double the conversion mode, the load is connected to the UPS Inverter (INV) and the Rectifier is sup-
plied by the main utility supply (L1). The battery remains charged or is under charged. The double con-
version mode protect the load from any utility main disturbance or failure.
—
4.1 Double conversion mode
—
4.1-1
—
4.1-1: “Double conver-
sion” operating mode
When the UPS system is in a double conversion mode, the status of UPS module control panel is dis-
played as follow:
LED Indicator
Color
Rectifier
Green
Bypass
Green
Battery
Green
Output
Green
Breaker
Status
MBS (Q1)
Open
UPS Output switch (Q2)
Closed
—
4.1-2
—
4.1-2: “Inverter Mode”
control panel mimic
In the unlikely event of an inverter fault or overload condition the UPS will transfer the load - automati-
cally and without interruption to the static bypass (transfer time = 0).
4 O P ER AT I N G M O D E S