The transport protection screws are installed at the factory in order to prevent damage during shipment. The
converter is a sensitive instrument and must therefore be handled with care.
Pressure Reduction Valve
The pressure values are approximations. An exact specification of the absolute value at which a rupture or
leak occurs is not possible. For operating pressures/fluids, which could possibly cause a meter pipe rupture
with resultant personnel injury, property damage, etc. special protective measures for the sensor installation
are recommended (special arrangements, protection covers, pressure relief valves etc.).
The sensor housing incorporates a 1/8“-nipple. When the nipple is removed, a pressure relief valve can be
installed to automatically block the flow to the sensor in the event of a leak. Installation information may be
found in the Section „Installation of a Pressure Relief Valve“.
!
Attention!
The max. operating pressure for meter sizes DN 3 [1/10”] and DN 6 [1/4”] is 50 bar.
For meter size DN 1.5 [1/16”] the max. pressure is 70 bar.
!
Attention!
Before start-up, both transport protection screws must be removed and replaced by the nipples included
with the shipment as shown in the figure. Before removing the transport protection screws observe the fol-
lowing:
Under no circumstances may humidity, liquids or foreign objects enter the flowmeter primary housing be-
cause the measurement accuracy could be adversely affected.
Fig. 11:
Transport protection
A
A
A
1
2
1
2
1. Transport protection screw
2. Nipple and gasket
Important!
Before removing the nipple from the sensor housing the following must be considered:
Under no circumstances may humidity, liquids or foreign objects enter the flowmeter primary housing be-
cause the measurement accuracy could be adversely affected. This type of problem can be avoided by ob-
serving the following instruction:
1. To acclimate the sensor it should be placed in a dry, clean area until it has reached an ambient temper-
ature of approx. 20 °C.
2. Care should be exercised when removing the nipple and installing the pressure relief valve.
3. Assure that the pressure relief valve is correctly installed and properly tightened, so the gasket is seated
correctly. Whenever it is removed the gaskets should be replaced.
Summary of Contents for CoriolisMaster FCM2000
Page 6: ...Contents 6 FCM2000 D184B111U02...
Page 91: ...11 Certificates D184B111U02 FCM2000 91 Fig 43...
Page 92: ...11 Certificates 92 FCM2000 D184B111U02 11 2 EU Type Examination Certificate Fig 44...
Page 93: ...11 Certificates D184B111U02 FCM2000 93 Fig 45...
Page 94: ...11 Certificates 94 FCM2000 D184B111U02 Fig 46...
Page 95: ...11 Certificates D184B111U02 FCM2000 95 Fig 47...
Page 96: ...11 Certificates 96 FCM2000 D184B111U02 Fig 48...
Page 97: ...11 Certificates D184B111U02 FCM2000 97 Fig 49...
Page 98: ...11 Certificates 98 FCM2000 D184B111U02 Fig 50...
Page 99: ...11 Certificates D184B111U02 FCM2000 99 Fig 51...
Page 100: ...11 Certificates 100 FCM2000 D184B111U02 11 3 PED Certificate of Compliance Fig 52...
Page 101: ...11 Certificates D184B111U02 FCM2000 101 11 4 EHEDG Certificate Fig 53...
Page 103: ......