80 Maintenance
Maintenance intervals
The table shows the maintenance tasks which can be done by the user. The
complete maintenance schedule is available at www.abb.com/drivesservices. For
more information, speak to your local ABB Service representative
(www.abb.com/searchchannels).
Maintenance task/object
Years from start-up
0
1
2
3
4
5
6
7
8
9 10 11 12 …
Cooling fans
Main cooling fan. Refer to page
(R)
R
(R)
(R)
R
(R)
Connections and environment
Quality of supply voltage
O O O O O O O O O O O O O
Improvements
Based on product notes
I
I
I
I
Spare parts
Spare part stock
I
I
I
I
I
I
I
I
I
I
I
I
I
Reform DC circuit capacitors (spare
modules and spare capacitors).
Refer to page
O O O O O O O O O O O O O
Other useful tasks
Tightness of the cable and busbar
terminals. Tighten if needed.
I
I
I
I
I
I
I
I
I
I
I
I
I
Ambient conditions (dustiness,
moisture and temperature)
I
I
I
I
I
I
I
I
I
I
I
I
I
Clean the heatsink. Refer to
page
O O O O O O O O O O O O O
Symbols
I
Inspection
, maintenance action if it is necessary
(I) Inspection
in harsh conditions*, maintenance action if it is necessary
R
Replacement
(R) Replacement
in harsh conditions*
O Other work
(commissioning, tests, measurements, etc.)
* Surrounding air temperature constantly over 40 °C, very dusty or humid conditions, cyclic
heavy load, or continuous nominal (full) load.
To maintain the performance and reliability of the drive, examine the drive annually. Contact
ABB Service at least once in three years to replace old components.
The recommended maintenance and component replacement intervals are based on
operation in specified ambient conditions.
Summary of Contents for ACS380 Series
Page 1: ...ABB MACHINERY DRIVES ACS380 drives Hardware manual...
Page 4: ......
Page 12: ...12 Table of contents...
Page 20: ...20 Safety instructions...
Page 46: ...46 Mechanical installation...
Page 60: ...60 Planning the electrical installation...
Page 86: ...86 Maintenance...
Page 120: ...120 Technical data...
Page 122: ...122 Dimension drawings Frame R0 1 phase 230 V...
Page 123: ...Dimension drawings 123 Frame R0 400 V...
Page 124: ...124 Dimension drawings Frame R1 230 V...
Page 125: ...Dimension drawings 125 Frame R1 3 phase 230 V and 3 phase 400 V...
Page 126: ...126 Dimension drawings Frame R2 230 V...
Page 127: ...Dimension drawings 127 Frame R2 400 V...
Page 128: ...128 Dimension drawings Frame R3 400 V...
Page 129: ...Dimension drawings 129 Frame R4 400 V...
Page 130: ...130 Dimension drawings...
Page 138: ...138 Resistor braking...
Page 169: ...BTAC 02 pulse encoder interface module 169 Dimensions 3AXD50000031154 rev A...