Technical Data 91
The scheduled maintenance program should be performed every 12 months,
including:
• Temperate check - Ambient temperature is within the temperature range as set
out in the “Technical data-Environmental” section .
• Enclosure check - Drive is installed in the enclosure which should be free from
dust and condensation.
• Wiring check - All the electrical connections tightness should be checked. All the
power cables should have no signs of heat damage
• NOTE If the drive has been in storage for a period longer than 2 years, the DC link
capacitors must be reformed.
ACS260-04.book Page 91 Thursday, December 24, 2020 4:33 PM
Summary of Contents for ACS260-04 Series
Page 2: ...ACS260 04 book Page 2 Thursday December 24 2020 4 33 PM ...
Page 4: ...ACS260 04 book Page 4 Thursday December 24 2020 4 33 PM ...
Page 8: ...8 Table of contents ACS260 04 book Page 8 Thursday December 24 2020 4 33 PM ...
Page 14: ...14 Safety ACS260 04 book Page 14 Thursday December 24 2020 4 33 PM ...
Page 22: ...22 Mechanical installation ACS260 04 book Page 22 Thursday December 24 2020 4 33 PM ...
Page 32: ...32 Electrical installation ACS260 04 book Page 32 Thursday December 24 2020 4 33 PM ...
Page 92: ...92 Technical Data ACS260 04 book Page 92 Thursday December 24 2020 4 33 PM ...
Page 96: ...96 Options and Kits ACS260 04 book Page 96 Thursday December 24 2020 4 33 PM ...