Changing the Battery
Section 5 Maintenance
120
3BSE 027 941 R301
Changing the Battery
Internal Battery
The internal battery is mounted inside the PM8xx processor unit. Since the battery
is not rechargeable, it is important to exchange it on a regular basis (refer to the
Maintenance Frequency Schedule for further details). For details of correct battery
polarity, remove the right-hand cover from the battery housing (see see
Specifications for the internal battery:
•
Type: Low-rate lithium battery, 3.6 V, 950 mAh.
•
Size: ANSI Size ½ AA / IEC size ½ R6
•
Lithium contents: 0.3 g
The battery must be exchanged whenever:
•
the PM8xx B(attery) LED flashes or is extinguished.
•
multiple or extended power cuts have occurred.
•
extended periods of system downtime have occurred for maintenance or
malfunctions.
For reasons of safety, exchange the battery only when the AC 800M is powered up.
Due to the batteries being connected in parallel, it is necessary, when using the
SB821 external battery, to remove the internal battery from the PM8xx in order to
avoid reducing available memory back-up time. In addition, status monitoring is
only provided for one battery.
It is possible to replace the internal battery with the AC 800M Controller online.
However, be sure to observe standard safe working practices at all times.
Summary of Contents for AC 800M
Page 1: ...ControlIT AC 800M Version 2 1 Controller Hardware Hardware and Operation...
Page 2: ......
Page 3: ...Controller Hardware Hardware and Operation ControlIT AC 800M Version 2 1...
Page 10: ...7DEOH RI RQWHQWV 10 3BSE 027 941 R301...
Page 20: ...Related Documentation About This Book 20 3BSE 027 941 R301...
Page 26: ...Operating Environment Safety Summary 26 3BSE 027 941 R301...
Page 42: ...Product Release History Section 1 Introduction 42 3BSE 027 941 R301...
Page 108: ...Powering from an External 24 V DC Source Section 3 Configuration 108 3BSE 027 941 R301...
Page 118: ...Verification of Redundant CPU Section 4 Operation 118 3BSE 027 941 R301...
Page 212: ...Low Voltage Directive LVD Appendix D Directive Considerations 212 3BSE 027 941 R301...
Page 214: ...Hazardous Location Approval Appendix E Standards 214 3BSE 027 941 R301...
Page 228: ...QGH 228 3BSE 027 941 R301...
Page 229: ......