ENGLISH
40
19 CABLE LAYING DIAGRAM
3 x 1,5
4 x 0,8
2 x 0,8
4 x 0,8
1
4
4
7
3
2
8
6
3
7
13
5
5
2 x 0,8
4 x 0,8
11
9
10
12
3 x 1,5 *
14
NYY 3 x 1,5 *
230 VAC
max. 100 mm vor
dem Schiebetor
max. 250 mm vom Boden
entfernt montieren
Max. 100 mm in front
of the sliding gate
Install max. 250 mm from
the ground
Cable laying diagram
1
Sliding opener
2
Gear rack
3
Limit switch bracket with magnet
4
Light barrier type 2 (external)/transmitter
(TX) and receiver (RX)
5
Light barrier type 1 (internal)/transmitter
(TX) and receiver (RX)
6
Key switch/command unit
7
Mechanical end stop, open/close
(overrun protection)
8
Warning light/fl ashing light with fl asher
unit/warning beacon
9
Safety contact strip, 8k2, mobile, main
closing edge in close direction
10
Safety contact strip, 8k2, mobile, main
closing edge in open direction
11
Safety contact strip, 8k2, stationary,
secondary closing edge in open direction
12
Safety contact strip, 8k2, stationary,
secondary closing edge in close direction
13
Handheld transmitter
14
Main switch, all-pole-disconnecting and
lockable
Summary of Contents for CX1024
Page 1: ...www 4ddoors com au instructions for fitting operating and maintenance Sliding operator CX1024 ...
Page 2: ...2 A B Ø 12 mm Ø 5 5 mm 17 mm 3 mm 2 17 5 mm 3 mm PIC 01 ...
Page 12: ...ENGLISH 12 DX SX DX SX 11 Figure 11 End positions Max 38 mm 102 mm 12 Figure 12 Distances ...
Page 37: ...ENGLISH 37 ...