8
50 mm
A
70mm
2
E
D
Figure 2 - Ground anchor
Note
The foundation must be allowed to harden suffi ciently before
installation.
4.2.3 Fixing the motor base plate to an existing
concrete foundation
Before drilling the four holes, their position must be marked on
the surface of the foundation. Use the motor base plate as a
drilling pattern. Always observe the installation dimensions! See
“Figure 1 - Foundation”
and
“Figure 2 - Ground anchor”
.
Then drill plug holes, clean the holes and fi x the base plate with
suitable installation materials. Ensure to tighten the nut and
washer to the ground.
ATTENTION!
Damage from dirt
Drilling dust and chips can lead to malfunctions.
►
Cover the opener when drilling.
100mm + X
X
m
min. 225
A
3
Ø M10
Figure 3 - Heavy load anchor
4.2.4 Opening the opener housing
The cover of the housing must be opened for the sliding opener
to be installed.
ATTENTION!
Potential damage from penetrating moisture!
►
Protect the control from moisture when opening the sliding
opener.
Summary of Contents for CX1024
Page 1: ...www 4ddoors com au instructions for fitting operating and maintenance Sliding operator CX1024 ...
Page 2: ...2 A B Ø 12 mm Ø 5 5 mm 17 mm 3 mm 2 17 5 mm 3 mm PIC 01 ...
Page 12: ...ENGLISH 12 DX SX DX SX 11 Figure 11 End positions Max 38 mm 102 mm 12 Figure 12 Distances ...
Page 37: ...ENGLISH 37 ...