Testing the Courier V.Everything Modem using AT&T n
15-7
Testing Using
Keyboard Data
(AT&T6)
1
Send
AT&M0&N3S14.0=0
to prepare the Courier V.Everything modem for
testing.
This command disables error control, fixes the connection rate at 2400
bps, and makes the Courier V.Everything modem return to command
mode when you type the escape code (
+++
).
2
Establish a connection with the remote device
3
If you haven't already done so, arrange with the remote user t
cooperate with the test.
If necessary, set the remote device to acknowledge the remote digital
loopback request. For example, older modems need to be set to S16=8.
4
Send
AT&T6
to the modem. The modem enters remote digital loopback
mode, and, if the modem is an external model, the MR status light
flashes.
5
Type a short message. It will be looped back to your modem by the
remote device and to your screen for verification. (The remote user will
not see your data.)
6
Send the escape code,
+++
, and the
AT&T0
to end the test.
Alternatively, you can end the test by sendin
ATH
,
ATZ
, or
ATZ!
Be
careful, because ATZ and ATZ! reset the Courier V.Everything modem i
addition to ending the test.
If you issue an invalid command, the Courier V.Everything modem sends
an ERROR message. If you set Register S18, the Courier V.Everything
modem automatically ends the test when the test timeout is reached. See
the example in the previous section,
Stopping a Test
for an example of
using S18.
Data errors indicate a problem with the remote device or with the phone
link.
7
Send
AT&M4
, unless you used a reset command (ATZ or ATZ!).
Summary of Contents for Courier
Page 12: ......
Page 28: ...1 14 CHAPTER 1 CONNECTING TO YOUR ISP ...
Page 36: ...3 4 CHAPTER 3 UPGRADING YOUR MODEM ...
Page 58: ...6 6 CHAPTER 6 WORKING WITH MEMORY ...
Page 64: ...8 4 CHAPTER 8 CONTROLLING EIA 232 SIGNALING ...
Page 72: ...9 8 CHAPTER 9 ACCESSING AND CONFIGURING THE COURIER V EVERYTHING MODEM REMOTELY ...
Page 80: ...10 8 CHAPTER 10 CONTROLLING DATA RATES ...
Page 96: ...12 6 CHAPTER 12 FLOW CONTROL ...
Page 108: ...13 12 CHAPTER 13 HANDSHAKING ERROR CONTROL DATA COMPRESSION AND THROUGHPUT ...
Page 112: ...14 4 CHAPTER 14 DISPLAYING QUERYING AND HELP SCREENS ...
Page 122: ...15 10 CHAPTER 15 TESTING THE CONNECTION ...
Page 142: ...17 8 CHAPTER 17 TROUBLESHOOTING ...
Page 156: ...A 14 APPENDIX A S REGISTERS ...
Page 172: ...B 16 APPENDIX B ALPHABETIC COMMAND SUMMARY ...
Page 178: ...C 6 APPENDIX C FLOW CONTROL TEMPLATE ...
Page 186: ...E 4 APPENDIX E V 25 BIS REFERENCE ...