2N TELEKOMUNIKACE a.s., www.2n.cz
60/377
1.
2.
3.
1.
2.
3.
Requirements
If the lift has a double door, the signal must be active only if both the door sets
are open, i.e., if it is really possible to leave the cabin.
The door position signal has to work even in the case of power outage.
Contact control
Requirements
None of the contact outlets terminals may be connected electrically with any
other electrical circuit and no voltage source other than the NO/NC contact may
be connected to the CANCEL terminals.
Procedure
Leave the CANCEL terminal in the lower position (5).
f you use a make contact, leave the jumper as it is (6th pin on jumper 12) –
CANCEL without jumper fitted (factory setting).
If you use a break contact, fit the jumper (6th pin on jumper 12) – CANCEL
inverted – jumper fitted.
Voltage control
Requirements
DC 12 to 48V voltage
Procedure
Move the CANCEL terminal two pins up into position (4).
For activation by voltage connection, leave the jumper as it is (6th pin on jumper
12) – CANCEL without jumper fitted (factory setting).
For activation by voltage disconnection, fit the jumper (6th pin on jumper 12) –
CANCEL inverted – jumper fitted.
Summary of Contents for Lift8
Page 1: ...www 2n cz 2N Lift8 Communicator for lifts User Manual Firmware Version 2 3 1 ...
Page 28: ...2N TELEKOMUNIKACE a s www 2n cz 28 377 Indication Elements ...
Page 40: ...2N TELEKOMUNIKACE a s www 2n cz 40 377 Examples of Connection ...
Page 70: ...2N TELEKOMUNIKACE a s www 2n cz 70 377 ...
Page 95: ...2N TELEKOMUNIKACE a s www 2n cz 95 377 ...
Page 136: ...2N TELEKOMUNIKACE a s www 2n cz 136 377 User name Admin Password 2n ...
Page 202: ...2N TELEKOMUNIKACE a s www 2n cz 202 377 Connection two cabin lift ...
Page 210: ...2N TELEKOMUNIKACE a s www 2n cz 210 377 ...