6、COOLING SYSTEM COMPONENT
55
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1251100-061093 M6×22 Hex flang bolt thread level 8.8 (color zinc)
1
2
1251112-003093 M6×45 Hex flange surface 9.8 bolt (color zinc)
1
3
1274200-079000 ZT310 water pipe clamp
(
φ9
)
1
4
1244200-069000 ZT310-V sub water tank leakage pipe
1
5
1274200-188001 ZT310-V sub water tank
1
6
1274200-088000 ZT310 water pipe clamp
(
φ10.5
)
1
7
1244200-070000 ZT310-V Sub water tank connection pipe
1
8
1251300-057093 non-standard nuts M10×1.5 (color zinc)
1
9
1274200-184000 ZT310-V sub water tank bracket
1
10
1251100-132003 non-standard bolt M10×1.5×80
1
Vice water tank components
Fig.6 COOLING SYSTEM
COMPONENT
PROCEDURE:
●
sub water tank assembly
Remove the bolts
⑴
and
⑵
,pull the sub tank assembly out of the gap.
After wearing the waterproof rubber gloves, put the sub tank assembly upside down (the sub water tank cover
down) into a plastic container.
After clamping the hoop
⑶
with pliers, pull the water pipe out of the main tank and remove the hoop
⑶
.
Vent the coolant in the secondary tank.
Clamp the clamp on the leak pipe
⑷
with pliers and pull it out. Subsequent production of motocycles will
reduce the clamps for leak pipe.
Clamp the hoop
⑹
with pliers and pull the water pipe
⑺
out of the sub tank
⑸
, then remove the hoop
⑹
.
●
Sub water tank bracket.
If it is necessary to remove the auxiliary tank bracket, fix the nut
⑻
with the sleeve by using the sleeve to fix
the head of the bolt
⑽
.
Remove the sub tank bracket
⑼
after pulling out the bolt
⑽
.
CAUTION:
●
Disassembling the cooling system while the motorcycle is hot is prohibited. Wait until the engine and muffler
cool down thoroughly for the manipulation.
●
Cooling liquid should be collected and hand over to qualified facilities for further treatment. Do not pour the
oil anywhere and avoid pollution of environment and water source.
●
Be sure to wipe the connecting surface with clean nonwoven before reassembling.