7、FRONT FORK COMPONENT
78
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1251100-112000 Disc brake tubing bolt M10×1
-
22
1
32N.m
2
1251513-013000
Brake brake tubing copper washer φ15×φ10.2×1.5
2
3
1224100-037000 0 grade flame retardant cable tie (black 3.6×295)
3
Fig.19FRONT FORK
COMPONENT
PROCEDURE:
●
Front disc brake main pump
Cut three straps
⑶
Place the oil pan under the hydraulic control unit
。
In the previous step of the parameter, remove the hydraulic control unit cover and the brake fluid step to
connect the FMC-HU tubing to the hydraulic control unit.
After wearing the waterproof gloves, remove the bolts
⑴
with a 12# sleeve; remove the copper washers
⑵
.Remove the FMC-HU tubing. It is recommended to replace the two copper washers
⑵
at the same time when
replacing the tubing. The bolts
⑴
can be replaced if they are not damaged.
Wipe the end faces of the bolt
⑴
and the front disc brake main pump before replacing the FMC-HU tubing.
After installing the tubing, add DOT4 brake fluid and vent the brake system. Detailed steps can be found in
Adding Brake Fluid.
CAUTION:
●
Be sure to disassemble the muffler and engine after they have cooled down completely. The horizontal support
of the vehicle should be fixed before disassembly and assembly work.
●
The precautions for brake fluid are described in the previous section.
●
The torque standard of the four tubing nut joints at the pilot unit is 18N.m
ABS brake system
-
2