5、FOOT PEDAL COMPONENT
41
CHK
ADJ
NO.
PART NO.
PART NAME
QTY
CAUTION
1
1250301-018093 GB6170 M6-LH (army green)
1
2
1274100-041000 Shift lever adjusting screw
1
3
1250301-020093 GB6170M6 (environmental color)
1
4
1250105-150093 GB5789M8×45(environmental color)
1
25N.m
5
1274200-035194 ZT310 front fender bushing (black zinc)
2
Fig.4 FOOT PEDAL
COMPONENT
PROCEDURE:
●
Move front left pedal foeward
First use 8# open-end wrench fasten the groove in the middle of adjustment screw
⑵
, and use the 10# open-end
wrench to loosen the nut
⑴
and
⑶
, and remove the adjustment screw
⑵
.
Remove the bolt
⑷
,move forward to one mounting hole for the front left pedal assembly.
Re-assemble the pedal assembly after applying a proper amount of threaded fastening to the head of the bolt
⑷
.
Use the open-end wrench to install the bushing
⑸
to the adjustment screw, use 1 piece bushing
⑸
for 1
hole.The whole car is shipped with two bushings
⑸
as standard. The bushing can only be fitted to the right-hand
thread side of the adjusting screw.
Rotating the adjustment screw and adjustment shift lever to the suitable position and lock the nut
⑴
and
⑶
.
CAUTION:
●
Ensure the motorcycle is well supported during manipulation. Avoid falling accident.
●
The height of gear shift rod should be ajusted to a suitable range. Otherwise the riding experience would be
influenced.
Front left pedal mounting position adjustment