YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 16
NJEX 7300G ver.08-2018
Section 2: System Installation
Figure 19
Figure 20
Optional Heater
A.C. Connection
CAUTION:
Excessive tubing lengths should be avoided. Installation
of the NJEX Odorization system should be as close to the
point of injection and Odorant Storage Tank as possible.
Maximum tubing length should not exceed 15’ (4.5 me-
ters) with the tubing size maintained as indicated in this
manual. If longer tubing lengths are required consult YZ
Systems Technical Service Department at; 800.653.9435
or 1.281.362.6500.
3. Connect the pipeline port, the center 1/4” tubing
connector of the odorant discharge manifold to the
pipeline connection using a dielectric union,
figure 19.
4. Connect the regulated actuation gas source, of 75 psi
(5.17 Bar) supplied by the NJEX system owner, to the
NJEX gas filter inlet fitting using a dielectric union,
figure 19.
• For pipeline pressures less than 200 psig
a single cut regulator (Fisher 67 YZ P/N
#A3-0042 or similar) adjustable to provide
75 psig to the linlet gas filter on the NJEX
enclosure should be acceptable.
• P/L pressure above 200 psig need a dual cut
regulation provess:
1. Intall the primary regulator on the pipeline (Fisher
1301 YZ P/N A3-0274 or similar), and adjust it to
provide 150 Psi to the secondary regulator.
2. Intall the scecondary regulator at the inlet gas filter
on the back of the NJEX enclosure (Fisher 67 YZ
P/N A3-0042 or similar), and adjust it to provide 75
psig to the NJEX system should be acceptable.
3. 3/8” Stainless Steel tubing shuld be used between
the two regulators.
• Dual pump enclosures, may require larger tubing be-
tween the regulators, and the secondary regulator may
need to have a larger orifice (Fisher 64 or simiar) if both
pumps run simultaneously.
Note:
In applications where the actuation gas supply has
high water content and /or a low hydrocarbon dew point,
additional actuation gas filtration or heating of the 7300G
system may be necessary. Bottled nitrogen can also be
used during cold operating conditions to avoid conden-
satioin in the actualtion gas supply line. Also an actua-
tion gas source pressure of 75 psi (5.17 Bar) should be
adequate in most installations.
5.
Connect the pipeline port of the odorant discarge
manifold to the pipeline connection using a dielectric
union and check valve,
figure 19.
6.
If a heater option was specified with this odorizer,
,
should be connected
to the electrical inlet located on the lower side
of the enclosure using 1/2” conduit and ap-
propriate pack off. Power requirements for the
heater are 1.67A for the 120VAC heater, and
.833A for the 240VAC heater. Each heater is a
thermostatically controlled 200Watt unit, figure
20. Dual unit enclosures may have dual heater
elements. Values provided are per heater element.
Odorant Discharge
Manifold Pipeline Port
Odorant Inlet
Connection
75 psi (5.17 Bar) Regu-
lated Actuation Gas
Содержание NJEX 7300G
Страница 1: ...NJEX 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M ...
Страница 2: ......
Страница 3: ...The NJEX 7300G Instruction Operating Manual Version 08 2018 ...
Страница 4: ......
Страница 10: ......
Страница 129: ...201 Ivyland Road Ivyland PA 18974 800 344 5399 P 281 362 6500 F 281 362 6513 Sales yzhq com www yzsystems com ...