YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, Pennsylvania • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
Page 15
NJEX 7300G ver.08-2018
Section 2: System Installation
Figure 18
Figure 17
Figure 16
SPS-12
LPS120/240
* ATEX installations refer to Appendix E. page 117.
Skid System Connections
Required field connections to place the 7300G into
operation are as follows:
1. *Connect the solar panel cable to the system
power supply, SPS-12,
figure 16
.
Note: the solar panel should be mounted free of
obstructing shade and should be facing south in the
northern hemisphere or facing north in the southern
hemisphere.
1a. *If your system was ordered with the optional
LPS-120/240 power supply, AC power should be
connected in accordance with explosion-proof
code via a termination junction box to be attached
to the conduit provided at the upper left side on
the system enclosure. The power requirement
for 120VAC will be 100mA, or for 240VAC will be
50mA. these power inputs must be fused with a
maximum of 15A,
figure 7
. Minimum Allowable
operational voltage range for input is 85 VAC to
250 VAC.
2. Connect the flow signal device to the termination
block located in the system control enclosure,
figure 8
,
refer to the Wiring Control Document on
2a. If used, connect the optional Inhibit Input signal to
the termination block located in the system control
enclosure,
figure 8
,
Document on page 116 in Appendix D
.
2b. If used, connect the RS-485 communication wir-
ing as required to the termination block located in
the system control enclosure,
figure 8
,
Содержание NJEX 7300G
Страница 1: ...NJEX 7300G N A T U R A L G A S O D O R I Z A T I O N S Y S T E M ...
Страница 2: ......
Страница 3: ...The NJEX 7300G Instruction Operating Manual Version 08 2018 ...
Страница 4: ......
Страница 10: ......
Страница 129: ...201 Ivyland Road Ivyland PA 18974 800 344 5399 P 281 362 6500 F 281 362 6513 Sales yzhq com www yzsystems com ...