Follow the prompts on this screen to prepare your 600XLM, 6600, 6920, or 600 OMS (battery version)
sonde for unattended deployment as described below:
•
Verify that the current time and date are correct to ensure that your unattended sampling study begins
and ends when you desire. To verify correct the time and date, return to the Main menu and enter
4-
Status
or
5-System
. You may enter the correct date and time from either of these submenus.
•
Select
1-Interval
and enter the desired time between samples. Use the 24-hour clock format to enter
interval.
•
Select
2-Start Date
and
3-Start Time
to set the time that data will begin to log to sonde memory. If
you do not make any change to these entries, then the study will automatically begin at the next
integral time interval once you have pressed
C-Start logging
.
Example:
If the current time is 17:20:00 and your sample interval is 15 minutes, logging will
automatically begin at 17:30:00.
It is better to start the study prior to taking the unit to the field so that you can confirm that readings are
being saved to memory and carry out initial quality assurance measurements. However, if your study
demands that you start the instrument at the site at 6:00 PM, change the Start Time to 18:00:00.
•
Select
4-Duration
and set the length of the study in days. The default value is 365 days (which is
longer than most deployments). In most cases, you will either want to stop the unattended study
manually or allow the batteries to be expended. It is wise to set the duration to a value longer than the
anticipated deployment. If you cannot retrieve the sonde at the expected time due to factors beyond
your control such as weather or illness, data will continue to be acquired as long as battery power is
present.
•
Select
5-File
and enter a name of no more than 8 characters that will be used by your external
computer to identify the study. Be sure to use ONLY alpha/numeric characters.
•
Select
6-Site
and enter a site name of no more than 31 characters. This filename will appear in your
sonde file directory, but will not be used to identify the file after transfer to your computer.
•
Check
7-Battery
to make certain that the voltage is suitable for the length of the study that you are
about to begin. No change can be made to this item via the software.
------------Unattended setup-----------
1-Interval=00:15:00
2-Start date=07/17/96
3-Start time=18:00:00
4-Duration days=14
5-File=clrlake3
6-Site=Clear Lake at Spillway
7-Bat volts: 9.1
8-Bat life 21.2 days
9-Free mem 18.9 days
A-1st sample in 8.10 minutes
B-View params to log
C-Start logging
Содержание 600DW-B
Страница 3: ......
Страница 239: ...Principles of Operation Section 5 YSI Incorporated Drinking Water Monitoring Systems Operation Manual 5 26...
Страница 251: ...Warranty and Service Information Section 8 YSI Incorporated Drinking Water Monitoring Systems Operations Manual 8 4...
Страница 259: ...Required Notice Appendix B YSI Incorporated Drinking Water Monitoring Systems Operations Manual B 2...
Страница 264: ...EMC Performance Appendix D YSI Incorporated Drinking Water Monitoring Systems Operations Manual D 2...
Страница 268: ...Specifications Appendix E YSI Incorporated Drinking Water Monitoring Systems Operations Manual E 4...
Страница 297: ......