
7.4 Trial Operation with MECHATROLINK-III Communications
7-11
7
T
rial Operation and Actual Operation
11.
While operation is in progress for step 10, confirm the following items.
Note: If the load machine is not sufficiently broken in before trial operation, the Servomotor may become over-
loaded.
Confirmation Item
Reference
Confirm that the rotational direction of the
Servomotor agrees with the forward or
reverse reference. If they do not agree, cor-
rect the rotation direction of the Servomo-
tor.
Confirm that no abnormal vibration, noise,
or temperature rise occurs. If any abnor-
malities are found, implement corrections.
12.5 Troubleshooting Based on the Operation and Condi-
tions of the Servomotor