
4.7 Connecting MECHATROLINK Communications Cables
4-43
4
W
iring and Connecting
S
ER
VOP
ACK
s
4.7
Connecting MECHATROLINK Communications Cables
Connect the MECHATROLINK-III Communications Cables to the CN6A and CN6B connectors.
Note: The length of the cable between stations (L1, L2, ... Ln) must be 50 m or less.
Use the following procedure to remove the MECHATROLINK-III Communications Cable con-
nectors from the SERVOPACK.
Note: The MECHATROLINK-III Communications Cable connector may be damaged if it is removed without being
unlocked.
Ln
L1
L2
S
ERVOPACK
Lock ejector
1.
S
lide the lock ejector
toward the
S
ERVOPACK.
2. Remove the connector
while the lock ejector i
s
s
lid
toward the
S
ERVOPACK.