5 - 57
CHAS
6. Install:
●
Swingarm
1
●
Pivot shaft
2
●
Washer
3
●
Nut (pivot shaft)
4
NOTE:
●
Apply the molybdenum disulfide grease on
the pivot shaft.
●
Insert the pivot shaft from right side.
7. Check:
●
Swingarm side play
a
Free play exists
→
Replace collars.
●
Swingarm up and down movement
b
Unsmooth movement/binding/rough spots
→
Grease or replace bearings, bushings
and collars.
5PA51820
T
R
.
.
63 Nm (6.3 m · kg, 45 ft · lb)
5PA51830
8. Install:
●
Washer
1
●
Bolt (rear shock absorber-relay arm)
2
NOTE:
●
Apply the molybdenum disulfide grease on
the bolt.
●
Insert the bolt from left side.
5PA51840
T
R
.
.
36 Nm (3.6 m · kg, 25 ft · lb)
9. Install:
●
Bolt (connecting rod)
1
●
Nut (connecting rod)
2
NOTE:
Apply the molybdenum disulfide grease on the
bolt.
5PA51850
T
R
.
.
53 Nm (5.3 m · kg, 38 ft · lb)
10. Install:
●
Drive chain support
1
●
Drive chain support cover
2
●
Bolt (drive chain support cover)
3
●
Nut (drive chain support cover)
4
●
Bolt (drive chain support)
5
●
Nut (drive chain support)
6
5PAR0026
T
R
.
.
7 Nm (0.7 m · kg, 5.1 ft · lb)
T
R
.
.
16 Nm (1.6 m · kg, 11 ft · lb)
SWINGARM
Содержание YZ85( P) /LC
Страница 63: ...GEN INFO MEMO ...
Страница 113: ...2 16 SPEC MEMO ...
Страница 457: ... ELEC MEMO ...
Страница 506: ......
Страница 507: ......
Страница 508: ...PRINTED IN JAPAN 2004 04 1 8 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...