INSP
ADJ
SYNCHRONIZING THE THROTTLE BODIES
NOTE:
NOTE:
Prior to synchronizing the throttle bodies, the
valve clearance and the engine idling speed
should be properly adjusted and the ignition
timing should be checked.
1. Place the machine on a level surface.
2. Remove:
• shroud
• hood (left and right)
• headlight assembly
• headlight stay
Refer to “COWLINGS” in CHAPTER 3.
3. Install:
• vacuum gauge
(onto the synchronizing hose
)
4. Install:
• headlight stay
• headlight assembly
• hood (left and right)
Refer to “COWLINGS” in CHAPTER 3.
5. Start the engine and let it warm up for sev-
eral minutes.
6. Measure:
• engine idling speed
Out of specification
→
Adjust.
Refer to “ENGINE IDLE SPEED ADJUST-
MENT”.
Vacuum gauge
90890-03094, YU-08030
Engine idling speed
1,500 ± 100 r/min
(1,400 ~ 1,600 r/min)
10
SYNCHRONIZING THE THROTTLE BODIES
Содержание RX10RTL
Страница 2: ......
Страница 8: ......
Страница 21: ......
Страница 25: ......
Страница 29: ......
Страница 141: ......
Страница 259: ......
Страница 265: ...SPEC 113 ...
Страница 289: ...SPEC 113 ...
Страница 313: ...SPEC 113 ...
Страница 334: ...SPEC CABLE ROUTING CHEMINEMENT DES CABLES KABELDRAGNINGSSCHEMA CABLE ROUTING 134 ...
Страница 336: ...SPEC CABLE ROUTING 136 ...
Страница 338: ...SPEC CABLE ROUTING 138 ...
Страница 340: ...SPEC CABLE ROUTING 140 ...
Страница 342: ...SPEC CABLE ROUTING 142 ...
Страница 344: ...SPEC CABLE ROUTING 144 ...
Страница 346: ...SPEC CABLE ROUTING 146 ...
Страница 348: ...SPEC CABLE ROUTING 148 ...
Страница 350: ......
Страница 351: ......
Страница 352: ...2005 07 E F Sw ITP ...