Shutdown
Setting
⚫
11.4V (Default) x Battery Number
Low Capacity
Set battery low capacity (20~50%)
⚫
20% (Default)
Shutdown Voltage
Set battery voltage point for system shutdown in battery
mode (10.0~11V) x (battery Number)
⚫
10.7V (Default) x Battery Number
Battery Test
Periodic Battery
Test
Set periodic battery test disable or enable
⚫
Disable (Default)
⚫
Enable
Battery Test
Interval
Set battery test interval (7~99 Days)
⚫
30 Days (Default)
Stop by Time
Set time duration for battery test (10~1000sec)
⚫
10 sec (Default)
Stop by Battery
Voltage
Set the battery voltage at which battery test stops
(11~12V) x (battery Number)
⚫
11V (Default)x Battery Number
Stop by Battery
Capacity
Set the battery capacity at which battery test stops
(20~50%)
⚫
20% (Default)
Battery Age
Alert
Battery Age Alert
(Months)
Set battery age for replacement. (Disable,12~60Months)
⚫
Disable (Default)
If this feature is enabled and the battery has been
installed for the set number of months, the UPS will
alarm the warning
“Battery Age Alert”
.
Temperature
Compensation --
Set battery temperature compensation. (0~-5 (mV/C/cl))
⚫
0(mV/C/cl) (Default)
Auto Restart
BATT Volt
--
Set battery auto restart voltage
⚫
0V (Default)
Charging
Voltage
--
Set battery charging voltage. (14.1~14.4V)
⚫
14.1V(Default)
Set battery float voltage. (13.5~14.0V)
⚫
13.7V(Default)
4.2.6.4 Pre-Alarm Screen
The Setup-Pre-Alarm screen and setting list are shown in Figure 4-18 and table 4-9. Pre-Alarm
settings can be changed in any operation mode.
Содержание X90-2S
Страница 10: ...2 5 UPS Cabinet Model X90 2S Drawing Cabinet Height 42U Monitor Module 1 Max Power Module 2 Max Power 140kVA...
Страница 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Страница 15: ...Figure 2 13 Terminal Blocks...
Страница 17: ...Off There is neither a fault nor an alarm...
Страница 22: ......
Страница 29: ...3 Operation Mode and UPS Operation 3 1 Block diagram of UPS Wiring diagram for dual inputs Figure 3 1...
Страница 37: ......
Страница 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Страница 42: ......
Страница 53: ...Figure 4 6 Control screen page...
Страница 55: ...Figure 4 9 System Measurement Screens...
Страница 56: ...Figure 4 10 Module Measurement Screens...
Страница 88: ......