Step 3
Switch ON the Maintenance Bypass
Breaker as shown below.
Step 4
Switch OFF the Main Breaker (Q1) as
shown below.
ON
OFF
I
0
Q1
Main
Step 5
Now one can change Power Module or
Battery Module.
3.3.3.2 Transfer to UPS Protection
Step 1
Make sure the maintenance is complete. The Power Modules and
battery modules have been installed well.
Step 2
Switch ON the Main Breaker (Q1) as shown below.
Содержание X90-2S
Страница 10: ...2 5 UPS Cabinet Model X90 2S Drawing Cabinet Height 42U Monitor Module 1 Max Power Module 2 Max Power 140kVA...
Страница 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Страница 15: ...Figure 2 13 Terminal Blocks...
Страница 17: ...Off There is neither a fault nor an alarm...
Страница 22: ......
Страница 29: ...3 Operation Mode and UPS Operation 3 1 Block diagram of UPS Wiring diagram for dual inputs Figure 3 1...
Страница 37: ......
Страница 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Страница 42: ......
Страница 53: ...Figure 4 6 Control screen page...
Страница 55: ...Figure 4 9 System Measurement Screens...
Страница 56: ...Figure 4 10 Module Measurement Screens...
Страница 88: ......