2.11.3 External Battery Cabinet Connection
Figure 2-24 External Battery Cabinet Wiring
After the battery installation is completed, be sure to set up nominal battery voltage, battery
capacity and maximum charging current on LCD. Otherwise, if battery setting is different from
actual installation, the UPS will keep warning. Please refer to section 4.2.6.3 and
Table 4-9
for the
details.
Содержание X90-2S
Страница 10: ...2 5 UPS Cabinet Model X90 2S Drawing Cabinet Height 42U Monitor Module 1 Max Power Module 2 Max Power 140kVA...
Страница 12: ...2 6 1 Mechanical Data Dimensions Width Depth Height 600mm 1065m 2010mm Figure 2 8 Dimensions...
Страница 15: ...Figure 2 13 Terminal Blocks...
Страница 17: ...Off There is neither a fault nor an alarm...
Страница 22: ......
Страница 29: ...3 Operation Mode and UPS Operation 3 1 Block diagram of UPS Wiring diagram for dual inputs Figure 3 1...
Страница 37: ......
Страница 39: ...Step 7 Switch ON the output breaker Q3 AC startup procedure is complete...
Страница 42: ......
Страница 53: ...Figure 4 6 Control screen page...
Страница 55: ...Figure 4 9 System Measurement Screens...
Страница 56: ...Figure 4 10 Module Measurement Screens...
Страница 88: ......