4-34
Section 4 Disassembly/Assembly/Adjustment
8. Fuser
Installation
1. Perform the installation in the reverse order of
removal.
NOTE
:
•
(Fig. 7): Install the Finger with the both
ends of the Spring under the Shaft.
(Fig. 7)
8.5.1 Fuser Fan Motor Assembly
Replacement
Removal
1.
WARNING:
Power off the machine and
disconnect the
power cord.
2. Remove the Platen Glass. ……............ (4.1.1)
3. Open the Front Cover and then the machine.
4. Remove the Left/Rear Upper Covers.
5. Remove the Drum Unit and place a black
bag over it. ……..,………………………. (5.1.1)
6. Move the Full-Rate Carriage slowly to the
right.
7. (Fig. 1): Loosen the Fuser Fan Motor Assy
Mounting Screw.
NOTE
:
•
(Fig. 2): The Vibration Preventing
Damper Tapes are attached to the
Fan Motor Assy securing areas. If
the screws are not loose enough,
you may not be able to remove the
Fan Motor Assy.
➀
. Loosen Screws enough.
➁
. Remove Screw.
(Fig. 1)
8. (Fig. 2): Remove the Fuser Fan Motor Assy.
➀
. Disconnect P/J409 from Main PWB.
➁
. Remove Fuser Fan Motor Assy.
(Fig. 2)
Installation
1. Perform the installation in the reverse order of
removal.
CAUTION
:
•
Put the shock absorber of the Fan
Motor. Assy against the Ozone
Filter securely.
8.5.2 Ozone Filter(Fuser Fan)
Replacement
Removal
1.
WARNING:
Power off the machine and
disconnect the power cord.
2. Open the Front Cover and then the machine.
3. (Fig. 1): Remove the Ozone Filter.
➀
. Put the Filter at front by pushing the rear
end of the Ozone Filter.
NOTE
:
•
When you can’t push out the Filter by
Step
➀
, remove the Fuser Fan Motor
Assy. ……………………......... (8.5.1)
➁
. Using the screwdriver in an upright position,
prise out the Ozone Filter.
NOTE
:
•
When removing the Ozone Filter
alone without replacing it with a new
one, do not use Step
➁
.
Remove the Filter by removing the
Fuser Fan Motor Assy instead.
(Fig. 1)
Installation
1. Insert the new Filter into the area from which
the old one has been removed.
➁
➀
Содержание 5915
Страница 1: ...XEROX 5915 SERVICE MANUAL Issued by Overseas Technical Group Xerox of Shanghai Limited 7th July 200 ...
Страница 4: ...Section 1 Service Procedure ...
Страница 6: ...1 2 Section 1 Service Procedure 1 1 Precautions Intentional bank page ...
Страница 9: ...Section 2 Troubleshooting ...
Страница 12: ...2 3 Section 2 Troubleshooting Intentional blank page ...
Страница 21: ...2 12 Section 2 Troubleshooting 2 3 Level1 Troubleshooting 2 3 Level 1 Troubleshooting 2 3 1 Level 1 F I P ...
Страница 35: ...Section 4 Disassembly Assembly Adjustment ...
Страница 37: ...4 2 Section 4 Disassembly Assembly Adjustment Intentional blank page ...
Страница 76: ...Section 5 Parts List ...
Страница 110: ...Section 6 GENERAL ...
Страница 123: ...Section 7 Wiring Data ...
Страница 124: ...7 1 Contents Section 7 Wiring Data Section 7 Wiring Data Plug Jack List 7 2 Connector Configuration 7 5 ...
Страница 128: ...7 5 Connector Configuration Section 7 WIRING DATA TOP VIEW Fig 1 TOP VIEW Fig 2 REAR VIEW Fig 3 MAIN MOTOR MAIN PWB ...
Страница 130: ...7 7 Connector Configuration Section 7 WIRING DATA R H VIEW A A DETAILS TOP VIEW Fig 6 Fig 7 ...
Страница 131: ...7 8 Section 7 Wiring Data Connector Configuration TOP VIEW Fig 8 BASE FRAME TOP VIEW Fig 9 ...
Страница 132: ...Section 9 BSD Block Schematic Diagram ...
Страница 135: ...9 3 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Страница 136: ...9 4 Section 9 BSD Block Schematic Diagram 1 1 STANDBY POWER ...
Страница 137: ...9 5 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Страница 138: ...9 6 Section 9 BSD Block Schematic Diagram 2 MODE SELECTION MACHINE RUN CONTROL START PRINT POWER ...
Страница 139: ...9 7 3 1 OPTICS Section 9 BSD Block Schematic Diagram ...
Страница 141: ...9 9 4 PAPER SUPPLYING AND TRANSPORTATION Section 9 BSD Block Schematic Diagram ...
Страница 143: ...9 11 5 XEROGRAPHICS COPY TRANSPORTATION AND FUSING Section 9 BSD Block Schematic Diagram ...