2-8
Section 2 Troubleshooting
2.2 Diagnostic(C/E) Mode
Parameter (NVM Value) Adjustment
Function:
This performs the Parameter (NVM Value)
Adjustment.
Procedure:
1. Enter Diagnostic(C/E) Mode.
2. Enter Chain Code “20” and press the
Start
button.
3. Enter the Function Code for the parameter
to be adjusted. Press the
Start
button.
•
The current value is displayed flashing on
the Quantity Display.
4. Enter a new set value with the key pad and
press the
Start
button.
•
The flashing display comes to remain on.
Then the old set value has been changed
to the new one.
5. When you press the
Stop Clear
button
once,
the Function Code Entry awaiting status is
initiated, while you press it twice, the Chain
Code Entry awaiting status is initiated.
NVM Initialization (20-96)
Function:
This initializes all NVM contents.
Procedure:
1. Enter Diagnostic(C/E) Mode.
2. Enter Chain Code “20” and Function Code
“96.” Press the
Start
button.
•
The Quantity is displayed as follows:
“55”
→→
“Ed”
•
Initialize the following NVM items:
1) Set initial values in all Functions in
Chain 20.
2) Reset alI Counters in Chains 30/40.
3) Set set-values in all Functions in Chain
50.
4) Set initial values in all programs in
Specification Setup.
3. To exit this mode, press the
Stop Clear
button twice.
Содержание 5915
Страница 1: ...XEROX 5915 SERVICE MANUAL Issued by Overseas Technical Group Xerox of Shanghai Limited 7th July 200 ...
Страница 4: ...Section 1 Service Procedure ...
Страница 6: ...1 2 Section 1 Service Procedure 1 1 Precautions Intentional bank page ...
Страница 9: ...Section 2 Troubleshooting ...
Страница 12: ...2 3 Section 2 Troubleshooting Intentional blank page ...
Страница 21: ...2 12 Section 2 Troubleshooting 2 3 Level1 Troubleshooting 2 3 Level 1 Troubleshooting 2 3 1 Level 1 F I P ...
Страница 35: ...Section 4 Disassembly Assembly Adjustment ...
Страница 37: ...4 2 Section 4 Disassembly Assembly Adjustment Intentional blank page ...
Страница 76: ...Section 5 Parts List ...
Страница 110: ...Section 6 GENERAL ...
Страница 123: ...Section 7 Wiring Data ...
Страница 124: ...7 1 Contents Section 7 Wiring Data Section 7 Wiring Data Plug Jack List 7 2 Connector Configuration 7 5 ...
Страница 128: ...7 5 Connector Configuration Section 7 WIRING DATA TOP VIEW Fig 1 TOP VIEW Fig 2 REAR VIEW Fig 3 MAIN MOTOR MAIN PWB ...
Страница 130: ...7 7 Connector Configuration Section 7 WIRING DATA R H VIEW A A DETAILS TOP VIEW Fig 6 Fig 7 ...
Страница 131: ...7 8 Section 7 Wiring Data Connector Configuration TOP VIEW Fig 8 BASE FRAME TOP VIEW Fig 9 ...
Страница 132: ...Section 9 BSD Block Schematic Diagram ...
Страница 135: ...9 3 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Страница 136: ...9 4 Section 9 BSD Block Schematic Diagram 1 1 STANDBY POWER ...
Страница 137: ...9 5 1 1 STANDBY POWER Section 9 BSD Block Schematic Diagram ...
Страница 138: ...9 6 Section 9 BSD Block Schematic Diagram 2 MODE SELECTION MACHINE RUN CONTROL START PRINT POWER ...
Страница 139: ...9 7 3 1 OPTICS Section 9 BSD Block Schematic Diagram ...
Страница 141: ...9 9 4 PAPER SUPPLYING AND TRANSPORTATION Section 9 BSD Block Schematic Diagram ...
Страница 143: ...9 11 5 XEROGRAPHICS COPY TRANSPORTATION AND FUSING Section 9 BSD Block Schematic Diagram ...