Operation
Pges
2 - 4
ba43121e03
01/2011
* The displays only appear during the first cycle after Stop or
AutoClean/AutoCal. During the following cycles, the last measured
value is displayed and continuously updated after the next cycle is
finished.
Duration
Depends on the settings in the
Measuring interval
menu.
Note
The WTW background correction procedure is used to determine the
concentration taking into account the color of the sample.
5
– The heating of the
digestion reactor switches
off.
– The cooling fan switches
on.
Digestion, Treactor = ... °C
6
– When T is < 50 °C, the
valves on the digestion
reactor are opened and the
sample is pumped on to
the photometer.
– The C and D reagents are
added.
Reaction
9
– After a waiting period, the
absorbance is measured
and the concentration is
calculated.
Reaction
10
– The measured value is
displayed.
Display of the measured
value
Step
Instrument status/action
Display indication during
the first cycle*