Woodward
Manual MRIK3-C EN
64
DOK-TD-MRIK3-C Rev. A
7. Notes on Relay Tests and Commissioning
7.1
Connection of the auxiliary voltage
To prevent destruction of the relay during tests the following has to be observed:
The aux. voltage supply of the relay must be within the permissible ranges.
The test current must not exceed the thermal rating of the measuring circuits.
The CTs must be connected properly.
All control and measuring circuits as well as the output relays must be connected properly.
The voltage ranges of the digital inputs must be adjusted correctly.
For further information please see Technical Data
7.2
Testing of Output Relays and LEDs
Checking of the output relays and of all LEDs can be triggered by the <TRIP>-push-button.
Test procedure
Entry Display
Note
<TRIP> Release
Version
Display of the relay software
version (part 1)* E.g. R2.0
<TRIP> Device
type
Display of the relay software
version (part 2)* E.g. ICER
<TRIP> Handoff
ID, part 1
Display of the relay software
version (part 3)* E.g. HO_1
<TRIP> Handoff
ID, part 2
Display of the relay software
version (part 4)* E.g. 5901
<TRIP> PSW ?
Call for enter the password
PSW? ****
TRI ?
Password entry
Ready for tests
<TRIP> TRIP
Start the test
Release of self-test relay
Pick-up of all output relays
Test of all LEDs
<Select/
Reset>
MRIK
Finish the test,
Output relays return to their
current operational state
* If possible please state when writing to us.
Careful when the relay is installed:
The relay test is not a pure internal test. All the output relays will be energized! The self-supervision
relay
releases first. Hereby a relay fault could be adopted by a connected control gear.
Thereafter all other existing output relays will pick up one after another. The reaction in the relevant
switchboard could be accordingly (e.g. trip of a priority CB).