Index
WMDKdoc020322
i
B
blade guide
idle side
C
Container Location
Container Location
D
drying schedule
kiln drying schedule
G
general information
installation requirements
introduction
I
installation and setup
control box
fan module
internal track
materials
plenum baffle
plenum blanking kit
O
operation
checking the depression
Conditioning Process
hold-down system
kiln operation
loading the kiln
Preconditioning
stickering the timber
timber preparation
S
service information
general contact info
specifications
INDEX
Содержание MK20-2
Страница 50: ...Operation Loading The Kiln 4 4 5 WMDKdoc020322 Operation See Figure 4 2 FIG 4 2 Blanking Sheet Material ...
Страница 54: ...Operation Temperature Controller 4 4 9 WMDKdoc020322 Operation Set the value to 95 Press the S key again ...
Страница 68: ...SECTION 9 WMUK MODULAR KILN RECORD SHEET 0 1 2 0 1 2 0 1 2 ...
Страница 69: ... 0 1 2 0 1 2 0 1 2 ...
Страница 71: ...Replacement Parts Fan Module Assembly Replacement Parts CESHdoc020322 10 2 10 10 2 Fan Module Assembly ...