Operation
Hold-down System
4
4-3
WMDKdoc020322
Operation
4.3
Hold-down System
After the timber has been properly put on stickers, weight (for ex. concrete or other heavy
material) should be placed directly above each row of sticks. These weights will hold the
top layers of timber flat as well as letting a little air flow between the top layer of timber
and the plenum baffle which lays over the timber.