Installation and Setup
Installation Requirements
Installation and Setup
WMDKdoc020322
3-2
3
3.2
Installation Requirements
Tools
Necessary tools and components that are required to install kiln:
Bolts
Screws
Drills
Silicones
Hole Saw 60mm
Hole Saw 102mm
Rivet gun (if mounting the kiln in the container)
Rivet gun for rivet nuts (if mounting the kiln in the container)
Drills: 5.1 mm, 9mm, 11mm, 16mm (for steel, concrete of wood depends on
application)
Silicon sealant 310ml
Foam sealant
Manpower
Although two people can put the kiln together, three people (adults) are recommended.
Two people working together should be able to assemble the kiln within one day.
Содержание MK20-2
Страница 50: ...Operation Loading The Kiln 4 4 5 WMDKdoc020322 Operation See Figure 4 2 FIG 4 2 Blanking Sheet Material ...
Страница 54: ...Operation Temperature Controller 4 4 9 WMDKdoc020322 Operation Set the value to 95 Press the S key again ...
Страница 68: ...SECTION 9 WMUK MODULAR KILN RECORD SHEET 0 1 2 0 1 2 0 1 2 ...
Страница 69: ... 0 1 2 0 1 2 0 1 2 ...
Страница 71: ...Replacement Parts Fan Module Assembly Replacement Parts CESHdoc020322 10 2 10 10 2 Fan Module Assembly ...