Operation
Checking The Depression
Operation
WMDKdoc020322
4-10
4
4.7
Checking The Depression
When the kiln is in operation the chamber temperature and depression should be
checked each day.
IMPORTANT!
Before starting the kiln you should to
completely fill up with distilled water the thermometer tank.
When the kiln is in operation you should refill about 100 ml
of distilled water each day 5 minutes before checking the
temperature and the depression.
Read the dry bulb temperature and make a note of this reading on the Kiln Record Sheet.
Then press and hold the “DRY BULB TEMP/WET BULB TEMP” button. Once the
temperature has stabilized this is the wet bulb reading. Make a note of this reading.
The Depression is the diffrence between the dry bulb temperature and wet bulb
temperature. (for ex. if dry bulb temperature reading is 60 and wet temperature reading
is 55 it means that the depression = 5
!
°
°
°
Содержание MK20-2
Страница 50: ...Operation Loading The Kiln 4 4 5 WMDKdoc020322 Operation See Figure 4 2 FIG 4 2 Blanking Sheet Material ...
Страница 54: ...Operation Temperature Controller 4 4 9 WMDKdoc020322 Operation Set the value to 95 Press the S key again ...
Страница 68: ...SECTION 9 WMUK MODULAR KILN RECORD SHEET 0 1 2 0 1 2 0 1 2 ...
Страница 69: ... 0 1 2 0 1 2 0 1 2 ...
Страница 71: ...Replacement Parts Fan Module Assembly Replacement Parts CESHdoc020322 10 2 10 10 2 Fan Module Assembly ...