Page 49
17333-15-0806
CAUTION: ALL WIRING SHOULD BE DONE BY A QUALIFIED ELECTRICIAN AND SHALL BE IN COMPLIANCE WITH ALL
LOCAL, CITY AND STATE BUILDING CODES. BEFORE MAKING THE ELECTRICAL CONNECTION, MAKE SURE THAT MAIN
POWER SUPPLY IS DISCONNECTED. THE APPLIANCE, WHEN INSTALLED, MUST BE ELECTRICALLY GROUNDED IN ACCOR-
DANCE WITH LOCAL CODES OR, IN THE ABSENCE OF LOCAL CODES, WITH THE NATIONAL ELECTRICAL CODE ANSI/NFPA
70 (LATEST EDITION)
.
A factory installed junction box is located on the lower right side of
the fireplace. Wiring must be fed to the junction box and attached to
the receptacle that is provided. Leave approximately 6" of wire in the
junction box for connection.
Attach black wire to one side of the receptacle and white wire to
opposite side of receptacle. The ground wire should be attached to the
green (ground) screw.
Install the receptacle into the junction box. Attach cover plate.
1. Using gloves, unpack liner components and check for damaged or
missing components.
2. Lower bottom louver and remove upper louver on fireplace.
3. Remove glass frame assembly from fireplace.
4. Remove rear logs from burner assembly.
5. Place brick panel (rear) against rear wall in fireplace.
Note: The top edge will have a half-moon cutout relief to match up
with the rear flue vent hole.
6. While holding the front finished edge of a side brick panel (left &
right), place brick panel (sides) against side walls in fireplace. NOTE:
The side brick panels should be installed with full brick pattern at
the bottom. Move side panels rearward until the back edge meets the
rear brick panel. Slide side brick panels down so they rest on firebox
bottom, and brick joints match up with the back brick panel.
7. Align grout lines on top brick panel with the grout lines on the side
brick panels. Place the top brick panel into brick panel holder. With
needle-nose pliers, carefully bend hold-down tabs on brick panel
holder over the edges of the top brick panel. The hold-down tabs will
securely hold the top brick panel in place.
8. Replace rear logs onto burner assembly. (Refer to log placement,
pages 33 and 34.
9. Attach glass frame assembly onto fireplace.
10. Raise bottom louver and replace top louver onto fireplace.
11. Installation of optional brick liner is complete.
STANDARD MILLIVOLT VALVE MODELS
120V DIRECT IGNITION VALVE MODELS
1. To wire Junction Box Receptacle, remove the tab on the side of the
receptacle (hot side) to split receptacle. This will be required to separate
blower and valve circuits.
2. Power for switched and live sides of Duplex Receptacle must come
from the same power source. (One circuit breaker on main panel must
switch all power off.)
3. From the wall box to the fireplace a 3-wire conductor with ground is
recommended, however (2) two-wire conductors with grounds may be
used in place of a 3-wire conductor with a ground if the black wires
from the thermostat and blower switch are identified.
4. Two wall switches, or a wall switch and thermostat may be used to
activate the two receptacle plugs independently.
JUNCTION BOX WIRING INSTALLATION INSTRUCTIONS
OPTIONAL BRICK LINER INSTALLATION INSTRUCTIONS