Installation and operating instruction
Gas condensing unit WTC-GB 15-B Compact and WTC-GB 25-B Compact
6 Operation
83309302 1/2018-05 La
87-196
6.6.7.2 Input measurement
Service WTC
Input
measurement
Wizard for input measurement.
An input measurement is required prior to every service.
Select expert level [ch. 6.6].
Select
Service WTC
and confirm.
Select
input measurement
and confirm.
The display shows
Flue gas measurement P max
.
Service WTC
Input
measurement
Servicing
Output
measurement
Control
measurement
Flue gas measurement P max
Current capacity
Boiler temperature
54 °C
100 %
Target load
100 %
SCOT base value
78
67
SCOT actual value
75 %
Gas valve
When the current capacity has reached 100 %:
Carry out flue gas measurement, enter values in the test sheet of the engineers
report.
Select
and confirm.
The display shows
Flue gas measurement P min
.
Flue gas measurement P min
Current capacity
Boiler temperature
54 °C
100 %
Target load
100 %
SCOT base value
78
67
SCOT actual value
75 %
Gas valve
Flue gas measurement P min
Current capacity
Boiler temperature
51 °C
40 %
Target load
40 %
SCOT base value
78
69
SCOT actual value
37 %
Gas valve
When the current capacity has reached min. load:
Carry out flue gas measurement, enter values in the test sheet of the engineers
report.
Select
and confirm.
The message
input measurement completed
appears briefly.
Display changes to menu
Service WTC
.