6.5.15 Set priority of DHW loading
The direct heating circuit (WCM-FS#1) is always operated with setting "Priority".
In this case the parameter is faded out.
Setting range
Priority
DHW has priority.
The heating circuit is blocked for the duration of DHW
operation.
Parallel
DHW and heating circuit are supplied in parallel.
Sliding
If the boiler temperature falls below the actual DHW val-
ue by +10 K, the heat consumption of the heating
circuits is switched off. If the boiler temperature exceeds
the actual DHW value by +20 K DHW and heating cir-
cuits are again supplied in parallel.
▶
Activate heating engineer level (see Ch. 6.5).
▶
Press function key
Heating circuit
.
▶
Press function key
Setting #2
.
✓
Menu
Setting #2
is displayed.
▶
Press function key
DHW operation
.
✓
Parameter
DHW operation
is displayed.
▶
Make selection using the dial knob and save with function key
OK
.
01
Setting #2
Supply min
8.0°C
Supply max
75.0°C
DHW operation
Priority
End
-
+
DHW operation
463
End
Standard
OK
Priority
Installation and operating instruction
Remote control station WCM-FS 2.0 and extension module WCM-EM 2.1
6 Operation
83277502 • 3/2012-10 • La
55-106
Содержание WCM-EM 2.1
Страница 107: ...83277502 3 2012 10 La ...