Terrazza Originale
Instructions for assembly
Version 5
12.06.2017
We reserve the right to make technical changes
Item number
111361-0000
Page 16/104
3.2 Affixing posts
In order to avoid the 90 posts being damaged by frost in winter, an additional Ø10 mm drain
hole must be drilled into the posts on site.
This hole is drilled into the front of the 90 posts at around 10 mm to 40 mm above the bottom
edge of the finished floor.
The antifrost hole must remain unobstructed, i.e. it must not be concealed by the post plate
cover cap.
Figure: Determining the post length
Lp
Length of post
UKd Bottom edge of guttering
90 post
115 post
Roof depth
Inner edge
post
Roof depth
Inner edge
post