13.
Open Bladder Tank and turn on supply water.
14.
Allow bladder tank to fill for 1 hour.
15.
Fill Hot Tank (Approximately 1 minute). Must depress both Hot and Extra Hot Buttons to
dispense. Red light should illuminate above dispensing area after 2 second delay.
16.
Fill Cold Tank (Approximately 2 minutes). Blue light should illuminate above dispensing area.
17.
Turn on Green Heater/Compressor Switch. I=ON.
WL400
Operating, Installation, and Service Manual Page 35 - Revision: 5-29-2015
Содержание WL400 Series
Страница 15: ...BASE CABINET SIDE REMOVAL WL400 Operating Installation and Service Manual Page 15 Revision 5 29 2015...
Страница 16: ...BASE CABINET CONFIGURATION WL400 Operating Installation and Service Manual Page 16 Revision 5 29 2015...
Страница 19: ...RIGHT SIDE PANEL REMOVED WL400 Operating Installation and Service Manual Page 19 Revision 5 29 2015...
Страница 20: ...RO MEMBRANE INSTALLED WL400 Operating Installation and Service Manual Page 20 Revision 5 29 2015...
Страница 41: ...WL400 COUNTER TOP LAYOUT WL400 Operating Installation and Service Manual Page 41 Revision 5 29 2015...
Страница 42: ...WL400 BASE LAYOUT WL400 Operating Installation and Service Manual Page 42 Revision 5 29 2015...