
After connecting the power and communication lines, you will need to configure the master and
slave settings, enable the group three-phase function, set the communication address, and phase
sequence. Follow the steps below to configure these settings (requires monitoring server access).
(1) Configure the master and slave settings
(there can only be one master in a system, with the
remaining being slaves).
WYIN5K
33
Содержание WYIN36
Страница 1: ...5kW Hybrid Inverter 10kWh Energy Storage System User Manual...
Страница 3: ...HYBRID ON GRID SOLAR INVERTER USER MANUAL Model WYIN36 WYIN46 WYIN5K User Manual...
Страница 11: ...3 Product Description Figure 1 WYIN5K 09 3 1 Inverter Overview Model WYIN5K Overview see Figure 1...
Страница 33: ...3 Enable the parallel function WYIN5K 31...
Страница 37: ...3 Enable the group three phase function WYIN5K 35...
Страница 43: ...1 Battery parameter settings This submenu interface contains 11 options divided into 3 pages WYIN5K 41...
Страница 57: ...HOME ENERGY STORAGE SYSTEM Model WY51100 User Manual...