
After completing the wiring of the power line and communication line, you need to set the master
and slave machines, enable parallel function, and then set the communication address and
phase number. The setting method is as following (please note that assistance from our
monitoring service is required, and LCD screen and APP settings will be available later).
(1) Set the master and slave machines.
In a given system, there should be only one master, with
the remaining inverters being slaves(refer to the images below for clarification).
WYIN5K
29
Содержание WYIN36
Страница 1: ...5kW Hybrid Inverter 10kWh Energy Storage System User Manual...
Страница 3: ...HYBRID ON GRID SOLAR INVERTER USER MANUAL Model WYIN36 WYIN46 WYIN5K User Manual...
Страница 11: ...3 Product Description Figure 1 WYIN5K 09 3 1 Inverter Overview Model WYIN5K Overview see Figure 1...
Страница 33: ...3 Enable the parallel function WYIN5K 31...
Страница 37: ...3 Enable the group three phase function WYIN5K 35...
Страница 43: ...1 Battery parameter settings This submenu interface contains 11 options divided into 3 pages WYIN5K 41...
Страница 57: ...HOME ENERGY STORAGE SYSTEM Model WY51100 User Manual...