Figure 20

The CT should be installed between the grid and the inverter, and it must be placed in front of the 
local load, around the live conductors. The arrow on the CT should point towards the grid (see 
Figure 21).

Figure 21

WYIN5K

26

Содержание WYIN36

Страница 1: ...5kW Hybrid Inverter 10kWh Energy Storage System User Manual...

Страница 2: ...ergy storage system If you wish to read the manual for the 5kW hybrid inverter please go to page 2 Thank you for purchasing WANROY s energy storage system If you wish to read the manual for the 10kWh...

Страница 3: ...HYBRID ON GRID SOLAR INVERTER USER MANUAL Model WYIN36 WYIN46 WYIN5K User Manual...

Страница 4: ...pection of Unpacking 3 5 Installation and Electrical Connection 3 6 Basic Installation Requirements 3 7 Inverter System Diagram Contents 1 1 Clarification 1 2 Additional Information 1 3 Storage of the...

Страница 5: ...Inspection 5 1 LED Indicators and Respective Status 5 2 Menu Introduction 5 3 Auto test function 37 38 47 37 52 48 48 50 51 49 49 49 48 48 48 8 Precautions for the Repairing 9 Working Modes 10 Techni...

Страница 6: ...sponsible for any damage that may occur as a result of not following the instructions provided in this manual The following table provides explanations for the symbols that will appear in this manual...

Страница 7: ...Be careful of Heat This product works under high voltage All operations on this product must be performed as described in the documents and by qualified professionals Follow Operating Instructions Bef...

Страница 8: ...inverter and on the power cord Therefore only authorized electricians should install and operate this equipment Even if the inverter is disconnected there may still be a risk of electric shock from hi...

Страница 9: ...optimal protection for the system and people PV modules with a larger capacity than the ground such as thin film photovoltaic modules on metal substrates can only be used if their coupling capacity do...

Страница 10: ...rical devices Familiarity with all relevant standards and guidelines Understanding and adherence to this manual and all safety instructions This inverter is a non transformer isolated and it is strict...

Страница 11: ...3 Product Description Figure 1 WYIN5K 09 3 1 Inverter Overview Model WYIN5K Overview see Figure 1...

Страница 12: ...if it has sufficient capacity If the battery energy is insufficient to meet its own consumption needs energy is obtained from the public grid This hybrid Inverter supports working with energy storage...

Страница 13: ...receipt If any damage to the packaging is visible or if you find that the unit is damaged after unpacking please notify the supplier immediately If any damaged or missing components are noticed pleas...

Страница 14: ...to the IEE wiring rules It is important to avoid removing the case of the inverter as it does not contain user serviceable parts Please seek assistance from qualified service personnel for any repair...

Страница 15: ...es for the installer to select a suitable location for installation in order to avoid potential damages to the device and operators 3 6 Basic installation requirements This inverter is designed to be...

Страница 16: ...or at a maximum backward tilt of 15 ensuring that the connector is at the lower end of the inverter Avoid horizontal installation and tilting forward or sideways as shown in Figure 4 Although the ele...

Страница 17: ...Figure 6 It is essential to maintain adequate clearance between individual inverters to prevent the circulation of ambient air from adjacent units If necessary increase the clearance space to ensure...

Страница 18: ...ws To avoid electric shock or other injury check the existing electrical wiring system or plumbing installation before drilling bracket fixing holes Installing the Wall Mount Using the mounting frame...

Страница 19: ...lace the inverter on the stand unless you are sure that the mounting frame is securely mounted on the wall Wall mounting Lift the inverter a little higher than the stand while taking its weight into a...

Страница 20: ...n damage electronic components When replacing or installing the inverter it is crucial to take appropriate anti static measures This includes wearing an anti static wrist strap or using an ESD mat to...

Страница 21: ...measure that helps to prevent electrical shock and damage to the inverter Ensure that all lines are properly selected and installed in compliance with BS7671 2015 which is the IEE Wiring Regulations...

Страница 22: ...ctional area requirements 3 7 1 Grid connection AC grid refer to Figure 14 and Figure 15 Model Minimum current A 32A WYIN5K 32A WYIN46 20A WYIN36 Model Electric Current A WYIN36 WYIN46 WYIN5K 32A 32A...

Страница 23: ...h should not exceed 50 meters because the line resistance existing on the cable will cause a large power loss Be sure to install a separate AC circuit breaker or other load disconnect device between t...

Страница 24: ...um open circuit voltage may appear and the input voltage at this time must not exceed the maximum input voltage of the inverter 500V 3 7 3 PV panel connections Refer to Figure 16 and Figure 17 This de...

Страница 25: ...d negative poles of the photovoltaic inverter Each PV port on the inverter can withstand 15A When PV is connected the positive and negative of the same road should be connected to the same PV terminal...

Страница 26: ...of the battery matches the specifications of the inverter Open the circuit breaker between the inverter and the battery Check for correct polarity of the battery and inverter connections ensuring that...

Страница 27: ...ter should be installed at the grid input terminal to enable the inverter to monitor the household s overall electricity consumption Based on the CT readings the inverter can adjust the PV power deliv...

Страница 28: ...T should be installed between the grid and the inverter and it must be placed in front of the local load around the live conductors The arrow on the CT should point towards the grid see Figure 21 Figu...

Страница 29: ...reless communication method The communication port connection is made through DRM connection CN12 located on the front board as shown in Figure 22 When the inverter receives an order from DRM0 connect...

Страница 30: ...is connected to the neutral wire N Take care to avoid any incorrect connections which could cause damage or safety hazards 4 3 Guidelines for Parallel and Group Three phase Operation Note Please refer...

Страница 31: ...on address and phase number The setting method is as following please note that assistance from our monitoring service is required and LCD screen and APP settings will be available later 1 Set the mas...

Страница 32: ...munication address The master inverter should be set to the master address while the slave inverters should be set to slave address 1 slave address 2 and so on refer to the images below for clarificat...

Страница 33: ...3 Enable the parallel function WYIN5K 31...

Страница 34: ...he phase number in parallel mode For group three phase connections please refer to the images below NOTE Each inverter must be connected to a separate energy storage battery Do not connect one battery...

Страница 35: ...tings enable the group three phase function set the communication address and phase sequence Follow the steps below to configure these settings requires monitoring server access 1 Configure the master...

Страница 36: ...2 Configure the communication address by setting the host address for the master slave address 1 for the first slave and slave address 2 for the second slave WYIN5K 34...

Страница 37: ...3 Enable the group three phase function WYIN5K 35...

Страница 38: ...4 Configure the phase number setting as follows set the master to A phase the slave 1 to B phase and the slave 2 to C phase WYIN5K 36...

Страница 39: ...l keyboard introduction Up Status Grid connection status blue Off grid status blue Warning light red On grid always on flashing always on flashing always on Waiting for on grid waiting for off grid Al...

Страница 40: ...5 2 1 Operating parameters 5 2 Menu Introduction On the main interface press the Down key to access the grid battery PV and load information screen WYIN5K 38...

Страница 41: ...ion 4 Energy statistics 5 Event information 5 2 2 On the main interface press the Up key to access the main menu interface which offers the following 5 options In the system settings press Enter to ac...

Страница 42: ...time period b Self Generation and Self Usage Mode When photovoltaic energy meets the load demand any excess energy charges the battery In Advanced Settings press Enter to enter the submenu interface T...

Страница 43: ...1 Battery parameter settings This submenu interface contains 11 options divided into 3 pages WYIN5K 41...

Страница 44: ...ed to set the maximum charging shutdown voltage 5 Dis Stop SOC Setting This parameter is used to set the stop discharge state of charge SOC for the battery 6 BAT Type Set the battery type 0 lead acid...

Страница 45: ...lithium battery by fully charging and discharging the battery one time Please note that this feature requires elevated permissions to be enabled C Forced to activate Forced Battery Activation D Turn S...

Страница 46: ...e following 3 options will be displayed This section is divided into 3 screens Use the Down or Up key to switch between screens The Battery Information is mainly used to display battery related parame...

Страница 47: ...roduction This page displays the daily energy production in numerical values and histograms Note PV Exp Photovoltaic output energy AC Exp AC output energy AC Imp AC input energy Bat Chg Battery chargi...

Страница 48: ...ction annual energy production and cumulative energy production are also displayed in numerical values and histograms In the event information setting press Enter to access the submenu interface which...

Страница 49: ...e a total of 3 pages and you can switch between pages using the the Down or Up keys Each page displays 3 historical error messages When there are no error currently reported the display will be empty...

Страница 50: ...e inverter cannot be reactivated 3 Turn off the PV switch 4 Verify the inverter s running status 5 Wait for the LCD screen to turn off before assuming the inverter shuts down completely If the inverte...

Страница 51: ...ter from the bracket and unscrew the bracket screws If possible pack the inverter in its original carton and secure it with adhesive tape If the original packaging is no longer available please use a...

Страница 52: ...the following main working modes Priority order Load Battery Grid PV energy is given priority for meeting load demand When PV energy is insufficient to meet the load demand the battery is discharged t...

Страница 53: ...9 2 Electricity Selling Mode Energy storage batteries and photovoltaic power generation can sell power to the grid during a set time period Priority order Load Grid Battery WYIN5K 51...

Страница 54: ...ge Max Apparent Power Output to Utility Grid VA Max AC Current Output to Utility Grid A Nominal Output Voltage V Nominal AC Grid Frequency Hz Max Total Harmonic Distortion Power Factor cos 500V 150V 1...

Страница 55: ...d Capacity 3 110 30s 120 10s 150 80ms Battery Voltage Range V Max Continuous Charging Current A Max Continuous Discharging Current A Battery Type Communication Way 41 6 58 5 95A PV AC hybrid charging...

Страница 56: ...Humidity Installation Altitude above Sea Level Self consumption at Night W Display Communications Warranty Dimensions H x W x D mm Weight 97 8 97 95 99 99 IP65 35dB 25 C 60 C Free Convection 0 to 95...

Страница 57: ...HOME ENERGY STORAGE SYSTEM Model WY51100 User Manual...

Страница 58: ...n 3 1 Product Introduction 3 2 Description of Energy Storage Capacity 3 3 Description of Appearance Contents 1 1 Usage Guidelines 1 2 Definition of Abbreviations 58 58 58 59 59 62 62 63 67 67 64 64 65...

Страница 59: ...orage Device 7 Mounting the Cover 81 81 74 74 74 80 77 77 78 80 76 8 System Maintenance 9 Technical Data 10 Product Size and Packaging 8 1 System Power off 8 2 Routine Maintenance 8 3 Storage and Main...

Страница 60: ...ual are used to explain the concepts associated with this product including product information installation guides electrical connections system debugging safety information frequently asked question...

Страница 61: ...ort damage such as falls deformation violent influences sharp objects 2 1 Security Symbols 2 2 General Security 2 2 1 Important Notice WY51100 Symbol Description Comply with the attached documents Dan...

Страница 62: ...any case it is strictly prohibited to Enter the fire building In any case the structure and installation sequence of the equipment shall not be changed without the permission of the manufacturer Do no...

Страница 63: ...nd endanger personal safety Do not place the battery module in water or other liquids Do not short circuit the battery terminals because a short circuit of the battery may cause a combustion accident...

Страница 64: ...e The personnel who operate the equipment including the operators trained personnel and professionals must meet the requirements of the local country Special operation qualifications such as high pres...

Страница 65: ...trical connections of the device to ensure that the device is grounded reliably This device is for indoor use only do not use this product in outdoor environment Do not install or use the device in a...

Страница 66: ...ansion of up to 3 energy storage modules Combining up to 15kWh battery packs WY51100 can match inverters of major brands such as SMA Victron Growatt GoodWe Deye Jinlang SRNE etc 3 1 Product Introducti...

Страница 67: ...3 3 1 Product Dimensions 3 3 Description of Appearance WY51100 battery battery base 580 0 8 4 580 580 145 12 145 60 5 KWH 10 KWH 65...

Страница 68: ...mmunication interface RESET 6 7 8 Communication interface definition WY51100 6 5 2 3 1 4 7 8 CAN RJ45 RJ45 RS485 1 Communication Feature Connected inverter Connected inverter Interface type Picture In...

Страница 69: ...e and the smart BMS system is integrated internally and can be easily scaled up to a 15kWh battery pack The battery pack can be combined with the inverter to form an off grid photovoltaic power storag...

Страница 70: ...aic directly supplies power to the load while charging the battery At night the battery supplies power to the load through the power module At night the battery supplies power to the load through the...

Страница 71: ...insides signs of damage and confirmation of accumulator type If there is any abnormality in the package or model of the accumulator please do not open the package and communicate with it as soon as p...

Страница 72: ...to the table WY51100 ID 1 2 3 4 5 6 Picture Unit Top cover Battery Base Mounting rack M4 screw Screw 580 145 12 mm 5 12kWh 51 2V 580 145 60 mm 200 68 20 mm M4 combination screw M4 self attack Expansi...

Страница 73: ...depending on meteorological conditions such as typhoons monsoons or topographic conditions DAMS hills Do not install it where children can touch it The energy storage device cannot be installed forwar...

Страница 74: ...nsure sufficient space for installation and heat dissipation To determine the installation location select a flat floor and solid wall as the installation location Determine the installation position...

Страница 75: ...the wall pulling piece to the wall Install the second battery in the same way The cover plate is then mounted on the battery pack WY51100 The battery pack is very heavy and requires multiple people to...

Страница 76: ...r Cables and Signal Cables 6 1 Cable Preparation 6 2 Internal Electrical Connection of the Energy Storage Device Before electrical connection ensure that the energy storage switch is in the Off state...

Страница 77: ...the corresponding interface of the battery module as shown in the diagram If multiple energy storage battery modules are used in parallel the modules automatically obtain the address code without oper...

Страница 78: ...7 Mounting the Cover When all wiring is complete and the system is functioning properly close the side cover WY51100 76...

Страница 79: ...ten to whether there is any abnormal sound during the operation of theenergy storage When the accumulator is running check whether the energy storage battery indicator is correct First commissioning a...

Страница 80: ...ould be arranged in time 7 When delivering the battery the first in first out principle should be followed 8 After battery production and testing it should be charged to at least 50 SOC before storage...

Страница 81: ...r manuals installation and service manuals and quality assurance requirements will not be eligible for product warranty Batteries stored for a long time unused more than 3 months must be stored in a d...

Страница 82: ...sional 9 Technical Data 8 4 Equipment Cleaning WY51100 Battery type Battery energy Battery capacity Battery voltage rating Battery operating voltage range Maximum charging current Maximum discharge cu...

Страница 83: ...80 mm and the base module is 580 145 60 mm The conventional packaging method for a single energy storage battery module is a carton with a size of 640 560 200mm 10 Product Size and Packaging 10 1 Prod...

Страница 84: ...WANROYTECH COM Address ROOM 13 27 F HO KING COMMERCIAL CENTRE 2 16 FA YUEN STREET MONGKOK KOWLOON HONGKONG WhatsApp 86 189 2675 1724 E Mail support wanroytech com WANROY TECHNOLOGY COMPANY LIMITED...

Отзывы: