BA 357-00 * 3.0 * 35700_06_Transport.fm
6-5
Transport 6
Once towing is over
Put the machine back into operation only after correct repairs
have been performed.
NOTICE
The brake can jam when unscrewing the hexagon socket protrude screw.
►
Unscrew both hexagon socket protrude screws at the same time. To
do this, alternately unscrew each screw a maximum
of one turn at a time.
1. Alternating between one and the other, unscrew both M6x60 screws
counterclockwise out of the threads
A
on the parking brake
B
.
2. Safely store the two screws in the machine where they won't be lost.
3. Check the drive and parking brake for correct operation.
Fig. 202
A
B
A
Содержание KRAMER 5055e
Страница 12: ...1 6 BA 357 00 3 0 35700_01_Vorwort fm 1 Preface Notes...
Страница 36: ...2 24 BA 357 00 3 0 Sicherheit_E fm 2 Safety Notes...
Страница 98: ...4 26 BA 357 00 3 0 35700_04_Inbetriebnahme_01 fm 4 Putting into operation...
Страница 103: ...BA 357 00 3 0 35700_04_Inbetriebnahme_02_a3 fm 4 31 Putting into operation 4 Switch panels Switch panels...
Страница 252: ...6 12 BA 357 00 3 0 35700_06_Transport fm 6 Transport Notes...
Страница 264: ...7 12 BA 357 00 3 0 35700_07_Wartung fm 7 Maintenance Maintenance label Affixed on the cabin...
Страница 340: ...7 88 BA 357 00 3 0 35700_07_Wartung fm 7 Maintenance Notes...
Страница 382: ...8 42 BA 357 00 3 0 35700_08_Betriebsst rung fm 8 Malfunctions...
Страница 408: ...9 26 BA 357 00 3 0 35700_09_Technische_Daten fm 9 Technical data...
Страница 416: ...S 8 BA 357 00 3 0 BA_35700_V3_enSIX fm Index...
Страница 417: ...BA 357 00 3 0 BA_35700_V3_enSIX fm S 9 Index...
Страница 418: ...S 10 BA 357 00 3 0 BA_35700_V3_enSIX fm Index...