9 Installation
21
100_0102_is_0003.fm
9
Installation
9.1
Safety
9.2
Before installation
Compliance with the following steps is required before the cable is installed.
1. Ensure that any loose packaging has been removed from the machine.
2. Inspect the machine and its components for damage. Do not operate the machine if there is obvious
damage. Immediately contact your Wacker Neuson representative for advice.
3. Check that all parts belonging to the machine (according to the delivery) have been delivered.
4. Attach components that have not yet been fitted.
5. Have suitable tools to hand.
9.2.1
AR2, 3, 4 Installation – power cable
Compliance with the following steps is required when installing the power cable:
1. Unscrew the screws from the terminal box.
2. Remove cap and seal.
3. Guide the power cable through the cable gland, cable support sleeve, and terminal box hole.
4. Secure the power cable in the terminal box with the clamp and screws - Torque 2.6 Nm.
5. Screw the cable gland to the terminal box with screws - Torque 2.6 Nm.
DANGER
Danger to life from incorrect installation and initial operation. Installation and initial
operation must only be carried out by a Wacker Neuson service engineer or qualified
electrician.
Errors made during installation and initial operation can lead to fatal situations and
cause significant material damage.
Complete installation followed by safety check according to applicable guidelines only.
Item
Description
Item
Description
1
Screws
6
Cable support sleeve
2
Cover
7
Screws
3
Seal
8
Clamp
4
Power cable
9
Screws
5
Cable gland