Engine installation
57
2
A
If the engine is flexible mounted:
Adjust the rubber mounts to
nominal height (A) with-
out using tightening tools (see following pages).
Lift the engine into the boat and on to the bed. The
lifting device should also be available when making
the alignment to the propeller shaft later on.
If the engine is rigid mounted:
Lift the engine into the boat and on to the bed. The
lifting device should also be available when making
the alignment to the propeller shaft later on.
Install adjustment bolts for vertical adjustment () in
the engine brackets. Tighten the bolts until they are
in contact with the bed plane.
Install adjustment bolts for lateral adjustment (2).
2
Install the rubber mounts on the engine brackets.
Grease the adjusting nut () and adjusting screw (2).
Use grease part no. 4644.
Содержание D11 series
Страница 1: ...Marine Propulsion Diesel Engines Installation 1 1 D E D5 D16 series ...
Страница 2: ......
Страница 208: ...206 References to Service Bulletins Group No Date Concerns ...
Страница 209: ...207 Notes ...
Страница 210: ...208 Notes ...
Страница 212: ...7748655 English 11 2007 ...