Propeller shaft systems
55
Push the propeller shaft into place and align the shaft
and the stern bearing with the reverse gear’s output
shaft (reverse gear’s flange).
To prevent the shaft from bending in the stern shaft
tube, the shaft can be centred as follows:
•
Install the shaft bearing (
4).
•
Centre the shaft (
1) in the propeller shaft tube (2)
using wedge-formed guides (
3).
•
Check that the shaft is not bent in front of the
tube; support the shaft if necessary.
After alignment has carefully been done, the stern
bearing can be bolted or bonded in place.
2
3
4
4 mm
(0.6")
The clearance between the
propeller shaft and tube for a
flexible mounted engine should
be min.
4 mm (0.16").
If the stern bearing is to be bolted to the stern, the
contact surface for the bearing flange must be sand-
ed flat first. Apply sealing compound, e.g. silicon rub-
ber, and tighten the bolts holding the bearing.
NOTE! The alignment must be checked after bond-
ing.
Содержание D11 series
Страница 1: ...Marine Propulsion Diesel Engines Installation 1 1 D E D5 D16 series ...
Страница 2: ......
Страница 208: ...206 References to Service Bulletins Group No Date Concerns ...
Страница 209: ...207 Notes ...
Страница 210: ...208 Notes ...
Страница 212: ...7748655 English 11 2007 ...