Engine room, ventilation and sound proofing
77
Other cables, electrical wires, battery leads etc can
be drawn through a rubber hose or through a special
PVC-tube (electrical), being built onto the bulkhead of
GRP. Possible clearance between the tubing and the
wires can be sealed off with some kind of insulation
material or sealing compound.
Shift cables, throttle cables and electrical wires
coming through bulkheads can perferably be drawn
through a tube or a grommet, sealing off properly. At
the same time the cables are protected against wear.
Fuel hoses going through a bulkhead should rest in
a grommet where they pass through the bulkhead.
The grommet seals off and protects the hose against
sharp edges, which might cause leakage.
Содержание D11 series
Страница 1: ...Marine Propulsion Diesel Engines Installation 1 1 D E D5 D16 series ...
Страница 2: ......
Страница 208: ...206 References to Service Bulletins Group No Date Concerns ...
Страница 209: ...207 Notes ...
Страница 210: ...208 Notes ...
Страница 212: ...7748655 English 11 2007 ...