Checking the heating surfaces for contamination
1.
Pull plug
aCA
and
a-Ö
from the
fan. Remove the cables from the
cable clip on the l.h. side of the
boiler.
2.
Pull the flame monitor from the
burner retainer.
3.
Insert burner retainer
A
(part of
the cleaning set) into the l.h. side of
the boiler.
4.
Undo four nuts from burner
B
and
remove the burner.
Further details regarding the individual steps
(cont.)
21
Initial start-up, inspection, maintenance
5692
536
GB
Содержание Vitoplus 300
Страница 99: ...A1 Main PCB A2 Power supply unit Connection and wiring diagrams external connections 99 Designs 5692 536 GB ...
Страница 103: ...Parts lists cont 103 Parts lists 5692 536 GB ...
Страница 104: ...Parts lists cont 104 Parts lists 5692 536 GB ...
Страница 105: ...Parts lists cont 105 Parts lists 5692 536 GB ...
Страница 106: ...Parts lists cont 106 Parts lists 5692 536 GB ...
Страница 107: ...Parts lists cont 107 Parts lists 5692 536 GB ...
Страница 109: ...Service Service Service Service Commissioning service reports cont 109 Commissioning service reports 5692 536 GB ...
Страница 111: ...Service Service Service Service Commissioning service reports cont 111 Commissioning service reports 5692 536 GB ...
Страница 113: ...Service Service Service Service Commissioning service reports cont 113 Commissioning service reports 5692 536 GB ...
Страница 119: ...119 5692 536 GB ...