3.
Set the current date with
a
/
b
.
4.
Confirm with
d
.
Changing the language at the control unit
1.
Press
c
.
The display shows "Select heating
circuit".
2.
Press
d
.
3.
After approx. 4 s press
c
.
4.
Select the required language with
b
.
5.
Confirm with
d
.
Function sequence and possible faults
For further details regarding faults, see page 68.
Display screen
Measures
Control unit is-
sues heat de-
mand
No
Increase set
value and ensure
heat is drawn off
Yes
Oil pre-heating
starts
No
after approx. 10
min
Check the oil pre-
heater, cables
and plug-in con-
nections
Fault
E6
Yes
The fan starts
after max. 10 min
No
Fault
Check the oil pre-
heater, fan,
cables and plug-
in connections
(the oil preheater
has not switched
through; the tem-
perature is not
achieved)
F9
Further details regarding the individual steps
(cont.)
10
Initial start-up, inspection, maintenance
5692
536
GB
Содержание Vitoplus 300
Страница 99: ...A1 Main PCB A2 Power supply unit Connection and wiring diagrams external connections 99 Designs 5692 536 GB ...
Страница 103: ...Parts lists cont 103 Parts lists 5692 536 GB ...
Страница 104: ...Parts lists cont 104 Parts lists 5692 536 GB ...
Страница 105: ...Parts lists cont 105 Parts lists 5692 536 GB ...
Страница 106: ...Parts lists cont 106 Parts lists 5692 536 GB ...
Страница 107: ...Parts lists cont 107 Parts lists 5692 536 GB ...
Страница 109: ...Service Service Service Service Commissioning service reports cont 109 Commissioning service reports 5692 536 GB ...
Страница 111: ...Service Service Service Service Commissioning service reports cont 111 Commissioning service reports 5692 536 GB ...
Страница 113: ...Service Service Service Service Commissioning service reports cont 113 Commissioning service reports 5692 536 GB ...
Страница 119: ...119 5692 536 GB ...