Cleaning and testing the flame monitor
1.
Pull flame monitor
A
from the
retainer for inspection and clean-
ing.
2.
Test the function:
Tests to be
carried out
Required re-
sponse
1. Start the burner
with the flame
monitor cov-
ered
Fault shutdown
at the end of the
safety period
"TSA"
2. Start the burner
with the flame
monitor ex-
posed to exter-
nal light
Fault shutdown
after a max. of
40 s
3. Burner opera-
tion with simu-
lated flame
blow-off. For
this, cover the
flame monitor
during opera-
tion and leave
in that state.
Restart followed
by a fault shut-
down at the end
of the safety per-
iod "TSA"
3.
Fit the flame monitor.
Further details regarding the individual steps
(cont.)
16
Initial start-up, inspection, maintenance
5692
536
GB
Содержание Vitoplus 300
Страница 99: ...A1 Main PCB A2 Power supply unit Connection and wiring diagrams external connections 99 Designs 5692 536 GB ...
Страница 103: ...Parts lists cont 103 Parts lists 5692 536 GB ...
Страница 104: ...Parts lists cont 104 Parts lists 5692 536 GB ...
Страница 105: ...Parts lists cont 105 Parts lists 5692 536 GB ...
Страница 106: ...Parts lists cont 106 Parts lists 5692 536 GB ...
Страница 107: ...Parts lists cont 107 Parts lists 5692 536 GB ...
Страница 109: ...Service Service Service Service Commissioning service reports cont 109 Commissioning service reports 5692 536 GB ...
Страница 111: ...Service Service Service Service Commissioning service reports cont 111 Commissioning service reports 5692 536 GB ...
Страница 113: ...Service Service Service Service Commissioning service reports cont 113 Commissioning service reports 5692 536 GB ...
Страница 119: ...119 5692 536 GB ...